Syndication Inc. Announces Mac Marshall Jr. Seeks Plant Manager/Engineer for S.C. 75,000 sq. ft. Warehouse; CEO Reminds Shareho
Syndication Inc. Announces Mac Marshall Jr. Seeks Plant Manager/Engineer for S.C. 75,000 sq. ft. Warehouse; CEO Reminds Shareholders of the 2% Common Stock Dividend Record Date of Oct. 19th 2009
DAMASCUS, Md., Sept. 23 /PRNewswire-FirstCall/ -- Syndication Inc., (Pink Sheets: SYNJ), reports that McCutcheon Marshall Jr., President and Chairman of the Board for Sentinel Renewable Energy S.C. Inc. and Pinnacle Energy Inc., the wholly owned energy subsidiary of Syndication Inc., is considering a number of candidates for the engineering supervisory position for the Companies 75,000 sq. ft. warehouse project.
The Company is considering a number of project managers that would be qualified to operate the Denami 600 series Bio Diesel manufacturing processor. Those qualifications are best articulated by the listed specs below:
Denami 600 Turnkey Production Line:
Includes:
- Two (2) Denami 600 Biodiesel Processors
- One (1) Environmental Checklist
- On-site installation and commissioning for up to Five (5) days
- On-site training for up to Five (5) days. SAID training may, or will be done after Installation but during or after Commissioning.
Additional Major components (these components are based on a typical site as shown in Methes's facility in Mississauga and there may be changes or adjustments that will be reflected in the total price):
Major Component Detail Description Qty Insulated Tanks Insulated Storage Tank 7 15,000 gallon vertical storage tank (11.5 x 19 feet) 4 Insulation 2" insulation with cladding 4 Heating coil 4 Level Sensor Level Sensor - Ultra Sonic 4 Fire Rated Valves 3 C.S. Full Port 150 lb. FLGD Ball Valve; Fire Safe 4 Teflon Gasket 1/16 Teflon Gasket 4 Blind Valve STD WELD BLIND FLANG 4 Custom Pipe Weld Assembly's 4 3" ball valves 3 C.S. Full Port 150 lb. FLGD Ball Valves 4 1" ball valves 1 in C.S. 3 PC Full Port Ball Valves 4 Sample Ports 3 Sample Ports (Top, Middle and Bottom) 4 Non-Insulated Tanks Non Insulated Storage Tanks 15,000 gallon vertical storage tank (11.5 x 19 feet) 7 Heating coils 7 Level Sensor Level Sensor - Ultra Sonic 7 Fire Rated Valves 3 C.S. Full Port 150 lb. FLGD Ball Valve Fire Safe 7 Teflon Gasket 1/16 Teflon Gaskets 7 Blind Valve STD WELD BLIND FLANGE 7 Custom Pipe Weld Assembly's 7 3" ball valves 3 C.S. Full Port 150 lb. FLGD Ball Valves 7 1" ball valves 1 in C.S. 3 PC Full Port Ball Valve 7 Sample Ports 3 Sample Ports (Top, Middle and Bottom) 7 Methanol Tank Flammable Storage Tank 12,000 gallon Double Wall vertical storage tank (11 x 15 feet) 1 Level Sensor Level Sensor - Ultra Sonic 1 Level Sensor Level Sensor - Tuning Fork 1 Habonim Ball Valve 2" Fire Safe Type Stainless Ball Valve 1 Habonim Ball Valve 1 Fire Safe Type Stainless Ball Valve 1 12" Vent 1 2" Emergency Pressure Vent 1 2" Working Vent End of line Blanketing Valve 1 Blanketing Valve Nitrogen Blanketing Valve 1 Tank Farm Piping 1 Loading and Unloading 3 Blackpipes, 1" Blackpipes (Victaulic) 3 Heat Trace Heat Cable, 20 Watts per ft. with Jacket 160 Power Connection Kit 110 V Power Connection Kit 4 Temperature Switch Temperature Regulator 2 Insulation 1" Fibreglass insulation 160 Tank Farm Piping 2 Methanol Line 2" Stainless Steel 2 Service Lines Hot water, cooling water and Nitrogen Service lines to the biodiesel processor 5 Containment wall Concrete Block Wall to hold 110% by volume of the largest tank 1 Seal Containment Wall proxy seal 1 Wall Cap Stainless steel Cap 1 Ladder For access into the containment wall Fire Rated Room 2 hr. fire-rated room 30 ft. to the steel deck plus one double steel frame and doors (subject to permitting) 1 Loading Rack; Rack Frame Stainless Stain Frame 1 Pump 7 1/2 HP Centrifugal Pump 3 Filters Filter Bag housing, gooseneck style 3 Truck Hoses 2 Tank Truck Hoses 15 ft. 30; Truck Sample Probe For sample collection from truck before loading 1 Composite Hose 2" x 25 1 Composite Hose 2" x 40 Tote Containment; Tote Containment for Catalyst 2 Boiler 500,000 BTU/hr 1 Air Compressor 7.5 HP, with Air Dryer 1 Material Handling Equipment 1 Booster Pump; To bring feedstock into the machine at a set PSI 1 Nitrogen Generator 1 CFM Nitrogen Generator 1 10 CFM Air Dryer 1 Parker Filter 1 Parker Autodrain 1 Safety Equipment; Eye Wash Station 1 LEL Meter Lower Explosive Limit Meter 1 Safety Glasses 1 First Aid Kit 2 MSDS Binder 3 Supplies Spill containment booms 15 ft., 8" Thick 5 Shovels 2 Brooms 2 Mops 2 Dry/Wet Vacuum 1 Work Bench 2 Construction and Installation; Epoxy Floor Up to 3500 square feet 1 Erect and install tanks 1 Feedstock Chemical Kit Wet Chemistry Kit to test for FFA Level 15 Centrifuge to Test for Water and Sediment